²La Vida Time Guarantee

Correct as of 5 November 2026

Terms and Conditions

This promotional offer commences on 5 November 2026 and is ongoing. La Vida Homes WA may vary or withdraw the offer at any time before the client signs their Preliminary Plans Agreement (PPA), subject to the protections for existing clients set out below.

Promotion Name: “La Vida Time Guarantee”

Promoter/Builder: La Vida Australia Pty Ltd (ABN 36 645 789 993), trading as La Vida Homes WA (BC 103744), of 142 Hasler Road, Osborne Park, WA 6017.

1. Guarantee Overview

Subject to these terms and conditions, La Vida Homes WA offers separate time guarantees for contract preparation, administration, and construction.

Guarantee Guaranteed period Measurement 
Contract preparation 4 weeks 
(20 business days) 
Titled lots only, from receipt of all required documentation and information to delivery of the building contract to the client for signing. 
Administration 4 calendar months Titled lots only, from the date the building contract is fully executed by both parties (the date of the last required signature) to Site Ready. 
Fully framed build 9 calendar months From slab down to Practical Completion Inspection (PCI). 
Brick veneer or double brick build 12 calendar months From slab down to PCI. 

Each guarantee has its own commencement and completion milestones. The periods must not be added together or treated as one continuous deadline from initial enquiry, PPA signing or building contract signing to key handover.

Site Ready is a separate milestone from site commencement and slab down. The build guarantee ends at PCI, rather than key handover. These promotional guarantees do not set a guaranteed period between Site Ready and slab down. 

2. General eligibility

The contract and administration guarantees apply to eligible titled lots and cover fully framed, brick veneer and double brick homes. Only one build guarantee applies to each home, according to its agreed construction method. 

The following home and site eligibility conditions apply: 

  • The home must be one of La Vida Homes’ standard single storey designs. 
  • Selections must be of a standard nature. 
  • The site must be a street-facing block in a greenfield estate within the Perth metropolitan area, extending from Two Rocks in the north to Armadale in the east and Mandurah in the south. 
  • The block must not be a brownfield, subdivision, battleaxe or strata lot. 
  • The block must not require retaining walls. 

To qualify for the administration and build time guarantees, the client must sign the building contract within eight (8) weeks of the date the client signs the building quotation, unless otherwise agreed in writing by La Vida Homes WA. The eight-week signing requirement will not affect the client’s eligibility where a delay caused by La Vida Homes WA prevents the client from meeting that deadline. 

3. Four-Week Contract Guarantee

For eligible titled lots, La Vida Homes WA guarantees to prepare and deliver the building contract to the client for signing within 20 business days of receiving all required documentation and information necessary to complete the contract.

Required documentation and information include developer guidelines, final floor plans and elevations, client selections where applicable, and confirmation of finance pre-approval. The period does not commence until all required items have been submitted in full and deemed satisfactory by La Vida Homes WA. 

For this guarantee, business days exclude Saturdays, Sundays, and public holidays in Western Australia. The guarantee is met when the building contract is provided to the client for signing; it does not require the client to sign within that period. 

The contract turnaround is subject to no significant changes being requested by the client or other stakeholders after drafting has commenced. Delays caused by third parties, including developers, banks and consultants, and events beyond the builder’s control may affect the turnaround. Any adjustment to the deadline and its reason must be communicated to the client in writing. 

The 4-Week Contract Guarantee applies to titled lots only. This section does not create a four-week commitment for untitled lots. 

No financial compensation is payable under the 4-Week Contract Guarantee. This does not limit the client’s rights under Section 11. 

4. Four-Month Administration Guarantee

For eligible titled lots, La Vida Homes WA guarantees that the project will achieve Site Ready within four calendar months from the date the building contract is fully executed by both parties, subject to these terms and conditions. The commencement date is the date of the last signature required to fully execute the building contract. 

Upon execution of the building contract, La Vida Homes WA will commence the required administrative works, including coordination of client selections, documentation, approvals, and other requirements necessary to progress the project to Site Ready. 

For the purposes of this guarantee, Site Ready means the point at which all required administration activities have been completed, and the project has been formally released to the Construction Department. La Vida Homes WA will record this milestone and notify the client in writing when it has been achieved. Site Ready does not mean that construction has commenced, or the slab has been poured. 

The initial guaranteed deadline is the corresponding date four calendar months after the commencement date. If the relevant month has no corresponding date, the deadline is the last day of that month. 

Where client-requested changes, a client’s failure to provide required information or approvals, or circumstances outside La Vida Homes WA’s reasonable control (Example: Planning Required, Site hasn’t achieved Practical Completion or Survey ready) directly delay achievement of Site Ready, the guaranteed period may be extended only by the resulting period of delay and subject to the applicable contractual requirements. 

Any extension must be supported by appropriate records and communicated to the client in writing, including the reason for the extension, the period of the extension, and the revised guaranteed Site Ready date. 

Where Site Ready is not achieved within the guaranteed administration period, as adjusted for any valid extensions, compensation will be payable in accordance with Section 7. 

5. Nine-Month and Twelve-Month Build Time Guarantees

Fully framed construction means construction using a timber or steel frame and non-brick external cladding. Eligible fully framed homes qualify for the 9-Month Build Time Guarantee. 

Brick veneer and double brick homes qualify for the 12-Month Build Time Guarantee. Brick veneer construction falls within the 12-month guarantee regardless of whether the frame is timber or steel. 

The guaranteed build period is measured from the date the slab is poured (slab down) to PCI. For eligible homes, La Vida Homes WA guarantees that PCI will occur within: 

  • 9 calendar months from slab down for fully framed construction. 
  • 12 calendar months from slab down for brick veneer or double brick construction. 

Calendar months are used rather than a fixed number of days. The initial guaranteed deadline is the corresponding date 9 or 12 months after slab down. If the relevant month has no corresponding date, the deadline is the last day of that month. These periods are subject to valid extensions of time under Section 6. 

In addition to Section 2, all services to the block must be installed and commissioned for the build guarantee to apply. Clients must pay progress claims on time and fulfil their obligations under the signed building contract, subject to the treatment of client-caused delays in Section 8. 

The applicable construction method and build guarantee will be confirmed in writing in the client’s building contract. If the construction method changes after signing, any resulting change to the applicable guarantee must be agreed in writing. 

6. Extensions to the guaranteed build period

The guaranteed build period may be extended in accordance with the extensions of time provisions of the client’s signed MBA WA Home Building Works Contract. 

Any extension must comply with the applicable contractual requirements, including notice requirements. Subject to those provisions, delays may include: 

  • Inclement weather. 
  • Shortages of building materials on the critical path. 
  • Vandalism or damage beyond the builder’s control. 
  • Construction shutdowns due to pandemic events. 
  • Delays by service providers, including Western Power, Atco, Water Corporation and NBN. 
  • The Christmas shutdown period. 
  • Other unforeseen events beyond the builder’s control. 

The events listed above do not automatically entitle La Vida Homes WA to an extension. Any extension must be permitted by, and calculated in accordance with, the signed building contract. 

A delay during administration does not, by itself, extend the build guarantee. The build period is measured from actual slab down, and any extension to that period must independently satisfy this section. 

7. Compensation

Administration guarantee

If Site Ready is not achieved within the guaranteed administration period, as adjusted for valid administration-stage extensions under Section 4, the client will receive $750 per week for each week overdue, up to a maximum of four weeks. The maximum compensation payable under the 4-Month Administration Guarantee is $3,000.

Build time guarantee

If PCI does not occur within the applicable guaranteed build period, as adjusted for valid extensions of time under Section 6, the client will receive $750 per week for each week overdue, up to a maximum of 12 weeks. The maximum compensation payable under the applicable build time guarantee is $9,000, for either construction category.

Separate entitlements and payment

The administration and build compensation caps apply separately. A client who qualifies for compensation under both guarantees may receive compensation under each, up to the respective caps. No financial compensation is payable under the 4-Week Contract Guarantee. Payments will be made to the client’s nominated bank account.

8. Client obligations

Clients must pay progress claims on time and fulfil their obligations under the signed building contract. 

Where a late payment or other failure by the client delays construction, any resulting extension to the guaranteed build period will be dealt with in accordance with Section 6 and the signed building contract. Client-caused administration delays must be dealt with in accordance with Section 4. 

A breach of the building contract does not, by itself, automatically void the client’s entitlement to compensation under these guarantees. 

9. Offer availability and changes

This promotional offer is ongoing from its confirmed commencement date and may be varied or withdrawn at any time before the client signs their Preliminary Plans Agreement (PPA). 

For clients who have already signed a PPA or building contract, the applicable guarantees will remain as originally agreed at the time of signing, unless a change is subsequently agreed in writing between the client and La Vida Homes WA. 

Publishing updated promotional terms does not retrospectively change an existing client’s agreed guarantees or automatically add the administration guarantee to an existing agreement. 

10. Relationship between the guarantees

Each guarantee is assessed separately against its own eligibility requirements, milestones, and permitted extensions. Missing a deadline under one guarantee does not, by itself, cancel another guarantee or remove an entitlement already accrued under it. 

11. Other rights

These promotional guarantees are additional to the client’s rights under the building contract and applicable law.

Nothing in these terms excludes, restricts, or modifies any right or remedy that cannot lawfully be excluded, restricted or modified. The compensation caps in Section 7 apply only to these promotional guarantees.